Who is Liable for Structural Defects in Construction?
Who is liable when a building develops structural defects? Explore a Kenyan High Court case involving an architect, structural engineer and contractor.

Who is Liable for Structural Defects in Construction?
Over the past week my legal reading has focused on cases of clients against consultants and contractors. I covered two cases regarding structural defects in construction. This is the first case I covered. Before we get to the crux of the matter, this blog is my reflection on a case before the High Court involving Franciscans of Our Lady of Good Counsel Registered Trustees (the client and plaintiff) against Kigondu t/a Align Architects (the 1st defendant) and two others: the structural engineer (the 2nd defendant) and the contractor (the 3rd defendant).
This article is not about generalised scenarios but rather this specific case
The Background
The plaintiff hired the defendants to construct a covenant house worth KES 78,000,000/=. However, after some time, structural cracks showed up on the building. The plaintiff therefore instituted a case against the defendants, seeking payment of the contract sum of KES 78,000,000 or a mandatory order compelling the defendants to demolish the condemned structure and construct another similar structure in accordance with construction standards, in addition to other damages.
As I read the introduction to the case, one question was dominant, who was actually deemed liable in the end for the loss. Stay with me for the answer.
Details About the Project
The plaintiff wished to construct a covenant house on their property in Athi River. He therefore entered into a consultancy agreement with the architect. The agreement also covered other external services such as utilities, water supply, sewer systems, service roads and other services.
The Dispute
Construction of the covenant building reportedly started in August 2011, and the building was handed over on 19th November 2011. The plaintiff reported observing visible cracks on the walls and other structural defects which upon investigation were found to compromise the structural integrity of the building. The plaintiff attributed the defects to structural designs that failed to take into account the soil composition.
The plaintiff sought professional advice from a different consultant, who deemed the building structurally unsound and in need of demolition.
The Architect’s Defence
Legal reads for the built environment
The architect claimed that the client had the ultimate authority to appoint any party it deemed fit, while asserting that they had performed their duties professionally and in accordance with the applicable standards.
The Engineer’s Defence
The engineer maintained that the client inspected the building at handover and raised no complaint at the time. The engineer also emphasised that they had performed their duties in accordance with their contractual obligations, exercising due skill, care and diligence.
The Contractor’s Defence
The contractor similarly denied responsibility, claiming that the building was structurally sound at the time of handover and free from cracks or defects. The contractor maintained that there was no credible evidence to demonstrate poor workmanship
Evidence
Some of the key submissions considered included the report from the witness who was an architect with 30 years of experience. He noted that the building developed cracks in the walls after the long rains. He noted that the structural details were not followed to the letter, as the designs showed that the walls were to extend all the way to the foundation. However, due to the site's conditions, columns were used after a structural redesign.
It was also noted that the engineer settled for a suspended slab but did not remove all the soil before suspending the slab. The plaintiff’s witness admitted that the construction followed the architectural and structural designs without deviations, that the defects only emerged well after the defects-liability period, and that the building was never condemned.
The engineer accordingly produced soil test results showing that the design was based on the findings and that the foundation was 3 m deep, as recommended by the consultancy. The contractor also claimed that they were not responsible for the structural designs. The contractor noted that a final certificate for the work had been issued, confirming that they had carried out their work satisfactorily.
Further facts
The architect who served as a witness for the plaintiff did not establish whether the structural revisions were unprofessional or contrary to approved standards. Also, the plaintiff’s expert report did not attribute the defects to negligent design or workmanship. The court found that the plaintiff had failed to establish, on a balance of probabilities, that the 1st, 2nd or 3rd defendants had breached the contract or acted negligently in their professional capacities.
The court also noted that the claimed reconstruction cost of KES 78,000,000 was not supported by credible expert or documentary evidence.
Conclusion
The court declined to award the claimed KES 78,000,000 due to a lack of strict proof. The court therefore dismissed the suit without awarding any damages or granting the reliefs sought by the plaintiff.
This case was-eye opening. I would like to know what you think about the judgement. I find it concerning that the defendants were not found liable despite being involved in the construction from start to finish. I, however, understand that suits may be dismissed if they fail on either points of law or matters of fact. What do you think of the case?
About the Author
El-Bethel Buyanzi is a fifth-year civil engineering student at the Technical University of Kenya and President of the Association of Engineering, Construction and Architecture Students (AECAS-TUK). He has a keen interest in engineering, the built environment, leadership and professional development. Through his writing, he documents his experiences, lessons and observations while exploring engineering practice, industry developments and the professional journey of an emerging engineer.
To learn more about the author, visit his about page or subscribe to his newsletter.
Legal reads for the built environment
Enjoyed this article?
Read more articles